Our Satisfied Customers
Windward Road Medical Centre
Carreras
Berger Paints
Knutsford Express
Express Fitness
Planning Institute of Jamaica
Development Bank of Jamaica
Urban Development Corporation
Heart Trust NTA
Negril Tree House
Traveller’s Beach Resort
The Altamont Hotel
Holiday Inn
Tensing Pen Resort
Restaurants of Jamaica
Tastee Limited
The Deck
Juici Beef Limited
Island Grill
Mother’s Enterprise
St. Peter and Paul Prep School
Immaculate Conception High School
Hilda’s Diocesan High School
Edna Manley College of the Visual and Performing Arts
University of the Commonwealth Caribbean (UCC)
Morant Bay High School
Salvation Army School for the Blind
Case Studies
Replaced four tap faucets, three toilets and two aerators with Niagara Stealth 0.8 GPF, Instant Save No Handle Faucet and Instant Off Aerators. Achieved a 50% reduction on water used in restroom and 30% reduction in water bill. Investment recovered in six months with perpetual savings.
Six toilets and nine faucets for customers and staff at the North Parade and South Parade locations were retrofitted with Vacuum Assist Toilets (0.8 GPF) with vandal resistant lids and No Handle Faucets with vandal resistant and anti-theft aerators. Investment ($251,100.00) recovered in four months. Expected perpetual annual savings thereafter is $750,000.00.
Replaced forty-four toilets with Niagara Stealth 0.8 GPF High Efficiency Toilets. Also installed twelve Instant Save No Handle Faucet and two Instant Off Aerators. Achieved an average of 50% reduction on water used in restrooms and 34% reduction in monthly water bill. Investment recovered in six months with perpetual savings.